Tuesday, November 27, 2012

Repair work and access to the building


Major repairs are under way (starting Wednesday) to the fan assembly at the top of the tower above the main entrance.  These repairs will have four likely impacts on our users :

1)  The chiller will be turned off during this work, so it could get uncomfortably warm inside the building.  Wear some light clothes in layers so you won't be too warmly dressed.  It will be especially warm on the third floor and in some enclosed areas (such as the Microforms Room).

2)  There will be times when the front entrance will be blocked with caution tape and cones.  Please use the side door at the loading dock when the front door is not accessible.  The area surrounding the crane, including the walkway from Melrose Ave, Thomson Hall and Moore Hall will also be closed.

3)  While the front door is blocked, there will be Circulation staff at the side door to check your Library card and inspect bookbags and briefcases.  Please cooperate with these folks!

4)  The work may get noisy at times.  We apologize for any distraction or unpleasantness.

Physical Plant tells us that this work may take 3-7 days.  Apparently the weather is a factor, and they also may encounter unexpected problems with the installation.  We ask you to have patience, but please know that you are welcome inside the building and our hours should be unchanged during this period.

Paula


No comments: